Project 11:

Consultancy Services for Preparation of Detailed Project Report for various Major/Minor Bridges under Mukhya Mantri Pul Nirman Yojana in Lakhisarai District, Bihar, India.


Government of Bihar has taken up a mandate for providing connectivity to villages, which are separated by rivers/ rivulets/streams/nallahs by making bridges over these water bodies under Mukhya Mantri Pul Nirman Yojana. The bridges are spread in various districts of Bihar. Consultant has been entrusted with 2 Bridges in Lakhisarai District need to be replaced with new bridges.The broad goals of consultancy services are:Preparation of Preliminary Project Report based on preliminary site investigations etc.Preparation of Detailed Project Report based on design of various components of the bridges and approach roads.Preparation of technical specifications and drawings, bid documents for tendering and pre-qualification documents.Distress analysis was performed on all the bridges in Lakhisarai District. The analysis showed that both bridges were beyond strengthening and repair, so these were replaced. The details of bridges are:

Sr. No. Bridge (Name) Bridge Type Span Arrangement Total Length
1 Harohar River Bridge RCC T-Beam and Slab 11*18 204.64m
2 Kiranpur, Manikpur Stream Bridge RCC Box Girder 4*30 125m

Project 12:


Consultancy Services for Preparation of Detailed Project Report for various Major/Minor Bridges under Mukhya Mantri Pul Nirman Yojana in Arwal District, Bihar, India.


Government of Bihar has taken up a mandate for providing connectivity to villages, which are separated by rivers/ rivulets/streams/nallahs by making bridges over these water bodies under Mukhya Mantri Pul Nirman Yojana. The bridges are spread in various districts of Bihar. Consultant has been entrusted with 4 Bridges in Arwal District need to be replaced with new bridges.The broad goals of consultancy services are:Preparation of Preliminary Project Report based on preliminary site investigations etc.Preparation of Detailed Project Report based on design of various components of the bridges and approach roads.Preparation of technical specifications and drawings, bid documents for tendering and pre-qualification documents.Distress analysis was performed on all the bridges in Arwal District. The analysis showed that every bridge was beyond strengthening and repair, so these were replaced. The details of bridges are:

Sr. No. Bridge (Name) Bridge Type Span Arrangement Total Length
1 Sherpur Punpun Nadi Bridge RCC Box Girder 4*30 125.050m
2 South Sone Nahar Bridge RCC T-Beam and Slab 12+18+12 43.840m
3 Sone River Bridge RCC Box Girder 30+30 62.550m
4 Amra Nallah Bridge RCC T-Beam and Slab 3*18 55.84m

Project 13:


Consultancy Services for Preparation of Detailed Project Report for various Major/Minor Bridges under Mukhya Mantri Pul Nirman Yojana in Jahanabad District, Bihar, India.


Government of Bihar has taken up a mandate for providing connectivity to villages, which are separated by rivers/ rivulets/streams/nallahs by making bridges over these water bodies under Mukhya Mantri Pul Nirman Yojana. The bridges are spread in various districts of Bihar. Consultant has been entrusted with 5 Bridges in Jahanabad District need to be replaced with new bridges.The broad goals of consultancy services are:Preparation of Preliminary Project Report based on preliminary site investigations etc.Preparation of Detailed Project Report based on design of various components of the bridges and approach roads.Preparation of technical specifications and drawings, bid documents for tendering and pre-qualification documents.Distress analysis was performed on all the bridges in Jahanabad District. The analysis showed that every bridge was beyond strengthening and repair, so these were replaced. The details of bridges are:

Sr. No. Bridge (Name) Bridge Type Span Arrangement Total Length
1 Morhar River Bridge RCC T-Beam and Slab 3*16 49.8m
2 Jamune River Bridge RCC T-Beam and Slab 4*18 74.45m
3 Bhuthi River Bridge RCC T-Beam and Slab 7*18 130.24m
4 Local Nallah Bridge RCC Box Girder 4*28 117.05m
5 Dardha River Bridge RCC T-Beam and Slab 11*18 204.64m

Project 14:


Consultancy Services for Preparation of Detailed Project Report for various Major/Minor Bridges under Mukhya Mantri Pul Nirman Yojana in Nawada District, Bihar, India.


Government of Bihar has taken up a mandate for providing connectivity to villages, which are separated by rivers/ rivulets/streams/nallahs by making bridges over these water bodies under Mukhya Mantri Pul Nirman Yojana. The bridges are spread in various districts of Bihar. Consultant has been entrusted with 4 Bridges in Nawada District need to be replaced with new bridges.The broad goals of consultancy services are:Preparation of Preliminary Project Report based on preliminary site investigations etc.Preparation of Detailed Project Report based on design of various components of the bridges and approach roads.Preparation of technical specifications and drawings, bid documents for tendering and pre-qualification documents.Distress analysis was performed on all the bridges in Nawada District. The analysis showed that every bridge was beyond strengthening and repair, so these were replaced. The details of bridges are:

Sr. No. Bridge (Name) Bridge Type Span Arrangement Total Length
1 Dhanarjay River Bridge RCC T-Beam and Slab 7*18 130.24m
2 Khuri River Bridge RCC Box Girder 9*30 281.3m
3 Koadihari River Bridge RCC Box Girder 4*30 125.05m
4 Kadahar River Bridge RCC T-Beam and Slab 8*18 148.84m

Project 15:

Consultancy Services for Preparation of Detailed Project Report for various Major/Minor Bridges under Mukhya Mantri Pul Nirman Yojana in Sheikhpura District, Bihar, India.

Government of Bihar has taken up a mandate for providing connectivity to villages, which are separated by rivers/ rivulets/streams/nallahs by making bridges over these water bodies under Mukhya Mantri Pul Nirman Yojana. The bridges are spread in various districts of Bihar. Consultant has been entrusted with 2 Bridges in Sheikhpura District need to be replaced with new bridges.The broad goals of consultancy services are:Preparation of Preliminary Project Report based on preliminary site investigations etc.Preparation of Detailed Project Report based on design of various components of the bridges and approach roads.Preparation of technical specifications and drawings, bid documents for tendering and pre-qualification documents.Distress analysis was performed on all the bridges in Sheikhpura District. The analysis showed that every bridge was beyond strengthening and repair, so these were replaced. The details of bridges are:

Sr. No. Bridge (Name) Bridge Type Span Arrangement Total Length
1 Kumhari River Bridge RCC Box Girder 3*16 49.83m
2 Tati River Bridge RCC T-Beam and Slab 1*30 31.3m