PROJECT: 1

Preparation of Detailed Project Report for Conservation & Management of Barna Reservoir, Raisen (M.P.) under the National Wetland Conservation Plan (NWCP), Madhya Pradesh, India.

Consultant has has taken up preparation of Detailed Project Report (DPR) for conservation & Management of Barna Reservoir, Raisen (M.P) under the National Wetland Conservation Plan (NWCP). The principal objective of DPR preparation is to get approval for schemes to reduce pollution loads to the Reservoir due to man made activities at Barna Reservoir Raisen (M.P). In order to reduce pollution loads in to the reservoir well planned and designed civic facilities in the town need to be installed and once these have been installed they need to be properly and effectively maintained and operated. The detailed project report preparation for the town will involve identification of all sources of pollution. These sources of pollution include the following:

• Sewerage system
• Sanitation system
• Water Supply
• Water shed/ Catchment treatment
• Municipal solid waste and Industrial Waste
• Bio- medical waste, Agriculture Waste and Dairy Waste
• Non point sources of pollution
• Crematoria
• River Front Development, Bathing Ghats, Dhobi Ghats
• Eco-tourism development activities.
• Funding
• Privatization
• Regulatory Liaison
• HRD & institutional framework.
• Public Awareness and Public Participation
• Environmental Assessment & Mitigations Measures

PROJECT: 2

Preparation of Detailed Project Report for Conservation & Management of Yashwantsagar Lake, Indore (M.P.) Under The National Wetland Conservation Plan (NWCP), Madhya Pradesh, India.

Consultant has has taken up preparation of Detailed Project Report (DPR) for conservation & Management of Yashwantsagar Lake Indore (M.P) under the National Wetland Conservation Plan (NWCP) . The principal objective of DPR preparation is to get approval for schemes to reduce pollution loads to the Reservoir due to man made activities at Yashwantsagar Lake, Indore (M.P). In order to reduce pollution loads in to the reservoir well planned and designed civic facilities in the town need to be installed and once these have been installed they need to be properly and effectively maintained and operated. The detailed project report preparation for the town will involve identification of all sources of pollution. These sources of pollution include the following:

• Sewerage system
• Sanitation system
• Water Supply
• Water shed/ Catchment treatment
• Municipal solid waste and Industrial Waste
• Bio- medical waste, Agriculture Waste and Dairy Waste
• Non point sources of pollution
• Crematoria
• River Front Development, Bathing Ghats, Dhobi Ghats
• Eco-tourism development activities.
• Funding
• Privatization
• Regulatory Liaison
• HRD & institutional framework.
• Public Awareness and Public Participation
• Environmental Assessment & Mitigations Measures

PROJECT: 3

Project Management Consultant (PMC) under the National Lake Conservation Plan (NLCP) / (NRAP) for Abatement of Pollution & Conservation of Sagar Lake – Sagar , Project Cost- US$ 5.25 Million, Madhya Pradesh, India.

National Lake Conservation Plan (NLCP) is a scheme of Govt. of India for abatement of pollution, conservation and environmental improvement of lakes through identified towns. This projects deals with Sagar lake at Sagar Town in Madhya Pradesh. Due to increase in population the lake is getting polluted, various human interventions through point and non point sources such as release of domestic and other waste water, solid waste and other pollutant substances resulting in organic matter in lake ultimately leading to eutrophicatuion of the lake and silting. Govt. of Madhya Pradesh with a grant from NRCD (National River Conservation Directorate) has planned for abatement of Pollution in the lake and have entrusted EPCO for implantation of the projects. The detailed designs have already been prepared for the improvement and up-gradation of the following components 

• Sewerage system
• Sanitation system
• Water Supply
• Water shed/ Catchment’s treatment
• Municipal solid waste and Industrial Waste
• Bio- medical waste, Agriculture Waste and Dairy Waste
• Non point sources of pollution
• Crematoria
• River Front Development, Bathing Ghats, Dhobi Ghats
• Eco-tourism development activities.

PROJECT: 4

Project Management Consultancy (PMC) Services under the National Lake Conservation Plan (NLCP) for Abatement of Pollution & Conservation of Beehar River, Rewa Town, Project Cost- US$ 5 Million, Madhya Pradesh, India.

National Lake Conservation Plan (NLCP) is a scheme of Govt. of India for abatement of pollution, conservation and environmental improvement of lakes through identified towns. This projects deals with Beehar River at Rewa Town in Madhya Pradesh. Due to increase in population the lake is getting polluted, various human interventions through point and non point sources such as release of domestic and other waste water, solid waste and other pollutant substances resulting in organic matter in lake ultimately leading to eutrophicatuion of the lake and silting. Govt. of Madhya Pradesh with a grant from NRCD (National River Conservation Directorate) has planned for abatement of Pollution in the lake and have entrusted EPCO for implantation of the projects. The detailed designs have already been prepared for the improvement and up-gradation of the following components 

• Sewerage system
• Sanitation system
• Water Supply
• Water shed/ Catchment’s treatment
• Municipal solid waste and Industrial Waste
• Bio- medical waste, Agriculture Waste and Dairy Waste
• Non point sources of pollution
• Crematoria
• River Front Development, Bathing Ghats, Dhobi Ghats
• Eco-tourism development activities.

PROJECT: 5

Detailed Project Report for Abatement of Pollution & Environmental Improvement for River Narmada & Maheshwar/Mandleshwar Towns, Project Cost- US$ 10.9 Million, Madhya Pradesh, India.

National River action plan (NRAP) is a scheme of Govt. of India for conservation and environmental improvement of rivers flowing through identified towns. This is a priority program funded by the Ministry of Environment and Forest, Govt. of India. Environmental Impact Assessment (EIA) and Environmental Management Plan (EMP) need to be developed on ADB Guidelines and Govt. of India MOEF Guidelines on Environment. Consultant has prepared a Detailed Project Report for abatement of pollution and for environmental improvement of Maheshwar/Mandleshwar towns on the banks of River Narmada with respect to various systems of the city/ town, listed below:

• Sewerage system
• Sanitation system
• Water Supply
• Water shed/ Catchment treatment
• Municipal solid waste and Industrial Waste
• Bio- medical waste, Agriculture Waste and Dairy Waste
• Non point sources of pollution
• Crematoria
• River Front Development, Bathing Ghats, Dhobi Ghats
• Eco-tourism development activities.
• Funding
• P rivatization
• Regulatory Liaison
• HRD & institutional framework.
• Public Awareness and Public Participation
• Environmental Assessment & Mitigations Measures