PROJECT: 1

Sammamish Canal Modifications, Client: Department of Natural Resources, Olympia

The department of Natural resources, Sammamish County, decided to lengthen and upgrade the existing canal for irrigation, water supply, recreation and controlling following. The existing length of the canal was 10 miles, it was lengthened to 20 miles.

PROJECT: 2

Irrigation Canal System at Snoqualmie Ridge, Client: City of Snoqualmie, Washington.

The project is 2,60,000 acres that needed irrigation. Canal system was developed for the irrigation and water supply purposes. The water from the storm drainage of the area was diverted into the canal. The main source of water at the mouth of canal is Snoqualmie River, which is about 1 mile from the area to be served.

PROJECT: 3

Reconditioning/ Rehabilitation/Relining of Distributaries & Minors in Sidhwan Canal Division, Ludhiana, Client: Punjab PWD, Sirhind Canal Circle, Ludhiana, Punjab

The Project is laning of exiting canal, The Consults has to ensure that all the works carried out under this programme fully- comply with engineering designs, technical specification, drawings, established code & sound engineering practices and contract documents. To prepare in section and plans forms and carry out quality assurance and technical audit during construction phase. The Consultants shall perform filed inspection by way of checking 20-25% of the total work independently and advice to PWD supervision team in accordance’s with quality assurance programme.

PROJECT: 4

Reconditioning/ Rehabilitation/Relining of Distributaries & Minors in Bathinda Canal Division, Bathinda, Punjab, Client: Punjab PWD, Sirhind Canal Circle, Ludhiana, Punjab

The Project is laning of exiting canal, The Consults has to ensure that all the works carried out under this programme fully- comply with engineering designs, technical specification, drawings, established code & sound engineering practices and contract documents. To prepare in section and plans forms and carry out quality assurance and technical audit during construction phase. The Consultants shall perform filed inspection by way of checking 20-25% of the total work independently and advice to PWD supervision team in accordance’s with quality assurance programme.

PROJECT: 5

Reconditioning/ Rehabilitation/Relining of Distributaries & Minors in Faridkot Canal Division, Faridkot, Punjab, Client: Punjab PWD, Sirhind Canal Circle, Ludhiana, Punjab

The Project is laning of exiting canal, The Consultant has to ensure that all the works carried out under this programme fully- comply with engineering designs, technical specification, drawings, established code & sound engineering practices and contract documents. To prepare in section and plans forms and carry out quality assurance and technical audit during construction phase. The Consultants shall perform filed inspection by way of checking 20-25% of the total work.