PROJECT: 1

Provision of Consultancy Services for Programme Management Support for Rural Water Supply and Sanitation Component Under Water Sector Development Programme (WSDP) in several locations in TANZANIA

The objective of the project is to have improved coordination, monitoring and evaluation of Rural Water Supply and Sanitation (RWSS) programme implementation across the mainland. Consultant. is providing support to the Community Water Supply Division (CWSD) in monitoring and overall management of the RWSS sub-program implementation. Consultant is preparing various guides and manuals that facilitate program management. Consultant is also building capacity for various stakeholders including NGOs.

 

 

 

PROJECT: 2

Consulting Services for Design and Supervision for Secondary Towns Integrated Urban Environmental Improvement Project STIUEIP Butwal, NEPAL

Consultant is responsible for providing review, inspection, advisory and support services for detailed design and procurement. This will involve conducting surveys, verification of feasibility studies and GIS base maps, finalization of design criteria and preparation of manuals, guidelines, and systems. Consultant will also provide consulting services for the Detailed Design and Procurement Assistance Phase. Other work includes project planning and management support to the piu, detailed engineering design, construction and post construction management phase support, construction management and contract administration, and capacity building of the municipality and service providers for operational sustainability.

 

PROJECT: 3

Water Supply and Sanitation Project for City of Olympia

The existing water supply system is not functioning properly there are leaks in the system. The consultant need to identification of leaks and remidation measures. The required capacity of the system is more than the project requirements. The consultant needs to identify new source of water. Design system for 25 years. The system needs to be expanded to include new developments. The Consultant also needs to study the current sanitation system and suggest needed improvement

• Collected, Reviewed analyzed all existing data
• Undertook site visit, carried out reconnaissance survey to identify missing data.
• Developed as-built drawings of the existing system for identifying leaks and their location and also    prepared drawings for remidation measure.
• Performed Topographic Surveys and development of drawing for existing water supply system.
• Study existing water distribution system for water assessment and leave detection.

PROJECT: 4

Water System and Sanitation System for City of Creswell Water District

The project was to revamp the existing water supply system. Which is deficient in supply the present day demands and replace it with a brand new system to meet demands for next 25 years. The water is being brought into the city from take up into mountains, which gets its water from melting ice. The main trunks 60 in dia will bring the water to the water tank in out skirts of the city. The length is approximately 11 miles. The water depending upon demand for domestic and industrial use will be diverted into different water reservoirs. The domestic water will be treated. Existing water distribution mains will be investigated for conditions and those in good condition will be left in place, the distribution lines will be provided to new domestic and industrial developments. Also reviewed the existing sanitation system and suggest improvements etc.

• Collected, reviewed and analysis existing data with regards existing water supply and capacity increase
• Undertook site visits to identify missing data
• Performed Topographic Surveys and developed base maps using Satellite Imagery.
• Metrological assessment and also assessment of yearly snow covers
• Undertook Population fore canting
• Assessed Capacity of the existing water basin in the mountains

PROJECT: 5

Develop Groundwater studies, Wetlands, water system and sanitation on system for city of Euegene

The Project consisted of Developing Groundwater studies, Wetlands, water system and sanitation system.

Wetland

Ground water studies including hydro geological studies, aquifer pump test analysis, ground water study work plans, sampling and analysis plans, field data collection, boring logs, aquifer tests, data collection, analytical, ground modelling and report production
Wet lands delineations, determinations and mitigation

Water Supply

• Collected, reviewed and analysis existing data with regards existing water supply and capacity increase
• Undertook site visits to identify missing data
• Performed Topographic Surveys and developed base maps using Satellite Imagery.
• Metrological assessment and also assessment of yearly snow covers
• Undertook Population fore canting
• Assessed Capacity of the existing water basin in the mountains
• For Environmental assessment and Mitigation carried out :baseline characteristic of existing    environmentalproject influence area highlight the major environmental issues and mitigation on to be    account mitigationSocio-economic analysis
• System modeling
• Financial and economic viability and determine sources of project funding.
• Study existing water distribution system for waste assessment and leak detection.
• Perform surveys for assessment of current use and future needs of users.
• Develop the need capacity of the system for year 2030.
• Prepare list of water connection
• Monitoring & Evaluation of water quality
• Set up a water quality laboratory web based quality Monitoring
• Develop rate analysis for Charging domestic and Industrial Clients.