DPR project for Integrated Storm Water Drains (ISWD) in Tambaram City Municipal Corporation managed by(TNUIFSL). Works Under (APCBTMP), INDIA
Funded by The World Bank
Client: Tamil Nadu Urban Infrastructure Financial Services Limited (TNUIFSL),
Tamil Nadu, India
Funding Agency: World Bank
Project Length / Coverage
Integrated storm water drainage network covering major and minor drains across Tambaram City Municipal Corporation area, with a total drain length of approximately 150–180 km (as per DPR planning estimates).
Project Cost
INR ~900–1,100 Crore (as estimated in the DPR)
MSV’s Role
MSV provided consultancy services for the preparation of the Detailed Project Report (DPR) for implementation of an Integrated Storm Water Drainage (ISWD) system in Tambaram City Municipal Corporation. The scope included surveys, hydrological and hydraulic analysis, system planning, detailed engineering designs, cost estimation, and preparation of implementation-ready DPR documents.
Project Impact
The project aims to mitigate urban flooding, improve drainage efficiency, and enhance climate resilience in Tambaram City. The DPR enables systematic planning and phased implementation of storm water infrastructure, contributing to improved urban living conditions, reduced flood risk, and sustainable urban development.
Technical Details
- Topographic and utility surveys
- Hydrological and hydraulic modeling of urban catchments
- Planning and design of primary, secondary, and tertiary storm water drains
- Integration with existing drainage and water bodies
- Climate-resilient design considerations
Preparation of detailed drawings, cost estimates, and implementation schedules