Delhi -Meerut 14 lane Hybrid Expressway

Independent Engineer Services during Operation & Maintenance Stage for Delhi-Meerut Expressway Package-I: from existing km 0.000 to existing km 8.360 in the State of Delhi and Package-III: from existing km 27.740 to existing km 49.346 in the State of Uttar Pradesh on Hybrid Annuity Mode . 6/8 Lane, Total Length – 30.630 km

Ministry of Shipping, Road Transport & Highways through NHAI has upgraded the stretch of Delhi-Meerut Expressway Package-I: from existing km 0.000 to existing km 8.360 in the State of Delhi through M/s Welspun Delhi Meerut Expressway Pvt.

Limited, “Concessionaire” on Hybrid Annuity Mode and NHAI has also upgraded the stretch of Delhi-Meerut Expressway Package-III: from existing km 27.740 to existing km 49.346 in the State of Uttar Pradesh through M/s Apco Chetak Expressway Pvt. Limited, “Concessionaire” on Hybrid Annuity Mode . M/s MSV International Inc. USA in association with M/s LSI Engineering & Consultants Limited has been assigned Consultancy Services as Independent Engineer during O&M stage for the period of 12 months for this project.

The IE is expected to play a positive and independent role in discharging its functions, thereby facilitating the smooth O&M of the Project. Broadly, the role of the IE is to :

i) Independently review, monitor and where required by the Agreement, to approve activities associated with the operation and maintenance of the Project Facilities to ensure compliance by the Concessionaire with the O&M requirements set out in Schedule ’L’ of concession agreement.

ii) Report to the parties on the various physical technical and financial aspects of the Project based on inspections, site visits and Tests.
iii) Assist the parties in arriving at an amicable settlement of disputes, should the need arise, and
iv) Review matters related to safety and traffic management measures adopted by the Concessionaire for the project.