First Avenue South Bridge, North Approach E-ramp, State of Washington, USA
The existing bridge at First Avenue crossing over green river was planned to be replaced by a new structure .Because of traffic demand a brand new interchange was developed to ease the traffic movement .The E-Ramp which is on the North approach of the New First Avenue Bridge was entrusted to consultant. It worked as a team member in a consortium, which consisted five Bridge design firms. The project was designed on a fast track basis. Some of the bridges are:
Sr. No. | Bridge (Name) | Bridge Type | Span Arrangement | Total Length |
1. | First Avenue South Bridge, North Approach E-ramp | Pre-stressed concrete girder | 3 x 135 ft | 405 ft |
Cookie | Duration | Description |
---|---|---|
cookielawinfo-checbox-analytics | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics". |
cookielawinfo-checbox-functional | 11 months | The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional". |
cookielawinfo-checbox-others | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other. |
cookielawinfo-checkbox-necessary | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary". |
cookielawinfo-checkbox-performance | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance". |
viewed_cookie_policy | 11 months | The cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data. |