Four Laning of Satna-Bela Section of NH-75, India
Independent Engineer Services for Four Laning of Satna-Bela Section of NH-75 km. 155.00 to km 203.04 (approx 48.04 km) BOT (Toll) on DBFOT Pattern under NHDP Phase IV, Madhya Pradesh
The project basically constitute up-gradation involving construction of 4 lane highway including Bridges; widening and rehabilitation of bridges and culverts; construction of high embankment/elevated structures/ROBs wayside amenities etc. along the existing highways including provision of realignment and bypasses. The proposed construction works will involve use of modern equipment and construction practices/techniques. The project will be developed on DBFOT pattern.
Consultant will independently review activities associated with design, design review, during construction, required quality assurance and quality control tests and operation and maintenance of the project on behalf of both MPRDC and Concessionaire so as to ensure compliance of the requirements of the provisions of Concession Agreement. Also, report to MPRDC on the Financial, Technical and physical progress of implementation aspects of the project including assisting the parties in arriving at an amicable settlement of disputes, if any.